Friday turned out to be a very productive day, 2 1/2 hours of which included site fitting a galvanised safety railing in Sevenoaks. The design is not particularly exciting but as always, neatly executed as well as fitting well with the architecture of the building.
This morning was all go on site, fitting 10m of balustrade by lunch. A simple fabricated frame but plenty of fun fire welding up all the s scrolls and forging all the collars. Im not a mad fan of scrolls and twists so i have taken the less is more approach, simple but elegant was the plan!
Fitted on a nice sunny day was this length of railing for a clients balcony, the design and steel stock selection has been made to match existing railing and other ironwork on the clients property.